| 69620 | A train passes a station platform in 36 seconds and a man… | Medium | |
| 69634 | The length of the bridge, which a train 135 metres long and… | Medium | |
| 69650 | One pipe can fill a tank three times as fast as another… | Medium | |
| 69651 | A walks at 10 kmph and 3 hours after his start, B… | Medium | |
| 69653 | Renu can do a piece of work in 6 days, but with… | Medium | |
| 69683 | Two persons A and B can complete a piece of work in… | Medium | |
| 69705 | The current of a stream runs at the rate of 5 kmph | Medium | |
| 69730 | A can do a piece of work in 10 days and B… | Medium | |
| 69732 | Excluding stoppages, the speed of a bus is 54 kmph and including… | Medium | |
| 69747 | Car A is 24 miles behind car B, which is traveling in… | Medium | |
| 69771 | The length of the bridge, which a train 160 metres long and… | Medium | |
| 69775 | Two persons start running simultaneously around a circular track of length 400… | Medium | |
| 69782 | A can do a piece of work in 5 hours; B and… | Medium | |
| 69821 | A man can row 5 kmph in still water | Medium | |
| 69823 | Arun and Tarun can do a work in 10 days.After 4 days… | Medium | |
| 69840 | A and B together can do a piece of work in 20days | Medium | |
| 69860 | At 12:00 a.m., Tom begins traveling on a certain bike path from… | Medium | |
| 69878 | A girl sitting in a train which is travelling at 100 kmph… | Medium | |
| 69895 | A man can row with a speed of 15 kmph in still… | Medium | |
| 69905 | Molly can do a task in 15 days while Sandy can do… | Medium | |
| 69911 | A walks at 10 kmph and 6 hours after his start, B… | Medium | |
| 69918 | In covering a distance of 24 km, Abhay takes 2 hours more… | Medium | |
| 69926 | A, B, K start from the same place and travel in the… | Medium | |
| 69935 | A train 90 m long running at 56 kmph crosses a platform… | Medium | |
| 69951 | To fill a tank, 25 buckets of water is required | Medium | |
| 69953 | Anand starts from a point P towards point Q, where PQ =… | Medium | |
| 69960 | Pipe A fills a swimming pool in 4 hours | Medium | |
| 69970 | A and B can do a piece of work in 2 days… | Medium | |
| 69991 | A train 250 m long is running with a speed of 68… | Medium | |
| 70030 | Pipe P can fill a tank in 2 hours, pipe Q in… | Medium | |
| 70042 | P can do the work in 12 days and Q can do… | Medium | |
| 70044 | The speed of a boat in upstream is 100 kmph and the… | Medium | |
| 70051 | Some persons can do a piece of work in 32 days | Medium | |
| 70057 | Two trains start at same time from two stations and proceed towards… | Medium | |
| 70071 | A jogger running at 9 km/hr along side a railway track is… | Medium | |
| 70112 | Two trains of equal lengths take 8 sec and 15 sec respectively… | Medium | |
| 70120 | A 220 m long train running at the speed of 120 km/hr… | Medium | |
| 70121 | If a person walks at 16 km/hr instead of 12 km/hr, he… | Medium | |
| 70122 | If Jack walked 8 miles in 1 hour and 15 minutes, what… | Medium | |
| 70131 | A train which has 430 m long, is running 45 kmph | Medium | |
| 70152 | A train 110 m long running at 52 kmph crosses a platform… | Medium | |
| 70159 | A train moves with a speed of 108 kmph | Medium | |
| 70167 | A train 120 m in length crosses a telegraph post in 12… | Medium | |
| 70191 | Excluding stoppages, the speed of a bus is 50 km/hr and including… | Medium | |
| 70209 | Convert the 1/3 m/s into kilometers per hour | Medium | |
| 70222 | A speed of 14 metres per second is the same as | Medium | |
| 70232 | The area of a square field is 400 km2 | Medium | |
| 70234 | A train traveling at 72 kmph crosses a platform in 30 seconds… | Medium | |
| 70242 | A train passes a platform in 44 seconds | Medium | |
| 70254 | A man can row with a speed of 13 kmph in still… | Medium | |