Lemma
MediumArithmetic word problems
GSM8K train #6030 · Arithmetic · Arithmetic word problems

Johnny is an engineer designing a bridge

Johnny is an engineer designing a bridge. The roadway deck for the top of the bridge needs 1600 tons of concrete to construct. The two bridge anchors need equal amounts of concrete, but only one has been built so far, using 700 tons of concrete. Johnny had to calculate how many tons of concrete the supporting pillars underneath the bridge would need, and he found that the total amount of concrete in the entire bridge will be 4800 tons. How much concrete did Johnny find he needs for the supporting pillars?

~8 minAnswer checked instantly

GSM8K — Grade School Math 8K (Cobbe et al., OpenAI, 2021) · train #6030

Stuck? A gentle nudge

No hints for this one.

Something off?
Workspace
Your answer
Loading the math keyboard…

Type naturally — sqrt, pi, / and ^ become notation. Any equivalent form is accepted. Press Enter to check.

Checked against the answer in GSM8K.