AQuA-RAT train #6378 · Arithmetic · Ratio & rate
A series of boxes are placed on a conveyor belt at one…
A series of boxes are placed on a conveyor belt at one end and unloaded at the other. The boxes are each 0.5 meters on each side and are placed immediately adjacent to one another as they are loaded. If the conveyor belt is 30 meters long and moves the boxes at a speed of 0.25 m/s, how long does it take for 100 boxes to be loaded and unloaded?
AQuA-RAT — Algebra Question Answering with Rationales (Ling et al., DeepMind, 2017) · train #6378
Stuck? A gentle nudge
No hints for this one.
Your answer
Checked against the answer in AQuA-RAT.