Lemma
MediumAlgebra word problems
AQuA-RAT train #23823 · Algebra · Algebra word problems

In a nuts and bolts factory, one machine produces only nuts at…

In a nuts and bolts factory, one machine produces only nuts at the rate of 100 nuts per minute and needs to be cleaned for 5 minutes after production of every 1,000 nuts. Another machine produces only bolts at the rate of 75 bolts per minute and needs to be cleaned for 10 minutes after production of every 1,500 bolts. If both the machines start production at the same time, what is the minimum duration required for producing 9,000 pairs of nuts and bolts?

~8 minAnswer checked instantly

AQuA-RAT — Algebra Question Answering with Rationales (Ling et al., DeepMind, 2017) · train #23823

Stuck? A gentle nudge

No hints for this one.

Something off?
Workspace
Your answer

Checked against the answer in AQuA-RAT.